Teknopark istanbul Robot Makina İimalatı

Teknopark istanbul Robot Makina İimalatıTeknopark istanbul Robot Makina İimalatıTeknopark istanbul Robot Makina İimalatı
Ana Sayfa
Medina Umbrella
WasteContainer
Railway
Shipyard
Azipod

Teknopark istanbul Robot Makina İimalatı

Teknopark istanbul Robot Makina İimalatıTeknopark istanbul Robot Makina İimalatıTeknopark istanbul Robot Makina İimalatı
Ana Sayfa
Medina Umbrella
WasteContainer
Railway
Shipyard
Azipod
More
  • Ana Sayfa
  • Medina Umbrella
  • WasteContainer
  • Railway
  • Shipyard
  • Azipod
  • Ana Sayfa
  • Medina Umbrella
  • WasteContainer
  • Railway
  • Shipyard
  • Azipod

Medina Umbrella Sharjah UNFOLDABLE SQUARE UMBRELA

120km/h Wind Pressure Durability Servo Power Screw Drive Sefar E-PTFE Membrane Structure 

8'000 Euro per Square of meter establish Cost

Open Closed Couurtyar Mosque Membrane Structure 28mx26m

80km/h Wind Pressure Durability Sefar E-PTFE Membrane Structure 

4'000 Euro per Square of meter establish Cost

RBTCS 300M CIRCULAR AMPHITHEATRE MEMBRANE STRUCTURE

80km/h Wind Pressure Durability Sefar E-PTFE Membrane Structure 

6'000 Euro per Square of meter establish Cost

ARCHITECTURE MEMBRANE FACADE STRUCTURE

Storm Wind Load Durability = 120km/hour Effective Wind Pressure = Weff= 1000N/m2 Horizontal Wind Force=15KN S400_Structure_Safety_Factor=4Times

We are design all of structure and Membrane shell geometry on CAD, FEM software and CFD (Computure Fluid Dynamic) - FSI (Fluid Structure lnstruction) Simulation, worst case scenario on 120 km/h wind load and earthquake loads. Validated & Calculateted on EasyTentech & Numeca & Ansys & Fluent

Our mechanical & mechatronics designs in accordance with EN (DiN) ISO FEM norms will be controlled by the customer's preferred plan approval organization.

Our manufacturing process; NDT Welding control includes shot blasting, stress relief firing, hat dip galvanized, CNC Borverg machining, epoxy paint applications.

We design lighter systems thanks to the high yield stress steels between S400 - S960 and at least 2 times more safe mechanical design, we install systems that depreciate itself in a shorter time with less electricity consumption. With regenerative energy management, we feed the braking energy of the servo motors back into the mains electricity.

More than 25 Years Anti Corrosion Protections Warrenty...

...per square of meter cost is 8'000 EURO+TAX

Approval of the foldable membrane surface building plan from German and Swiss Loays. Turnkey cost, 8,000 EURO per square meter including shipping or air cargo costs. We provide installation (placement) service free of charge.

This is provided free of charge by employees of architectural construction companies. Reinforced concrete project and foundation investment are not included in the Cost.

Teknopark İstanbul Robot Makina İmalatı

    indirmeler Download

    RBTCS MEDINA UMBRELLA PRESENTATION

    RBTCS NDA (docx)Download
    RBTCS MEDINA UMBRELLA PRESENTATION (pptx)Download

    Telif Hakkı © 2026 SSB Teknopark İstanbul Robot Makina İmalatı.

    Powered by

    This website uses cookies.

    We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

    Accept